The IATE Research and Experimental Laboratory for Processes in Energy Equipment.
Regulatory basis
Published research · 2024
The table lists state-funded and contract research from the laboratory’s published 2024 report. Amounts and statuses refer to that reporting period.
| Project and funding | Lead researcher | Amount, UAH | Status in 2024 |
|---|---|---|---|
| № 2603п Thermophysical characteristics of thin flat heat pipes for modernising existing and developing future radar stations State-funded research | V. Yu. Kravets | 1 080 000 | Continuing |
| № 2610/р Development and manufacture of a centrifugal mass-transfer distiller for drinking-water recovery in extreme conditions State-funded research | V. H. Rifert | 1 080 000 | Completed |
| ДЗ/153–2023 Development of an intelligent low-temperature building heating system based on a modular condensing boiler plant State commission | V. A. Voloshchuk | 1 502 600 | Completed |
| Дндч/0201.01/1540.01/262/2023 Fan speed adjustment under dynamic server load Contract research | O. V. Stepanets | 1 009 976 | Completed |
| ДНДЧ/0201.01/1500.02/259/2023 Development of high-efficiency heating and cooling systems for a combined heat and power generator Contract research | B. M. Rassamakin | 300 000 | Completed |
| Дндч/17.00/21/24 Development of rapidly deployable buildings and their energy systems, Q-Built NATO project / contract funding | V. I. Deshko | 184 100 | Completed |
| G 6245 Development of rapidly deployable buildings and their energy systems, Q-Built NATO project | V. I. Deshko | 1 172 953,80 | Continuing |
The report was signed by Laboratory Head Yaroslav Trokoz.
